Male hand preparing to assembling the metal rack in a warehouse or storage and shelves for cardboard boxes of products
Projects

Our Work

Explore completed warehouse systems, flooring solutions, and facility design projects for clients across multiple industries.

Selective pallet racking installation inside National Fencing & Decking Distributor warehouse
National Fencing & Decking Distributor
Tampa, FL

Titan designed and installed a new cantilever racking system to support this client’s expansion and reconfiguration of their outdoor warehouse, improving material access while maximizing usable space.

Office/showroom after with polished concrete floor and high-gloss finish
Office/Showroom
Port St. Lucie, FL
Before & After

As part of a new office and showroom buildout, Titan ground and polished the concrete floors to deliver a clean, high-gloss finish that elevated the space from day one.

Fitness & wellness center after with finished exposed aggregate concrete flooring
Fitness & Wellness Center
Winter Park, FL
Before & After

Titan restored a 50-year-old terrazzo floor through precision grinding and polishing, transforming the space into a polished foundation for a new boutique fitness and wellness center.

Completed warehouse mezzanine floor installation at outdoor lifestyle manufacturer
Outdoor Lifestyle Manufacturer
Miami, FL
Before & After

Titan partnered with this global manufacturer to design and install a 4,400-square-foot mezzanine, adding office and production space while avoiding the cost and disruption of new construction.

Large distribution warehouse with high-bay pallet racking system and staged inventory on the floor
Design & Distribution Company
Apopka, FL

After a previous vendor failed to deliver, Titan stepped in to redesign the layout, manage permitting, and install a complete pallet racking system, getting the project back on track and operational.

Fitness & wellness center warehouse with pallet racking installation
Wholesale Chemical Distributor
Orem, UT

Titan sourced and installed a new pallet racking system to support this client’s relocation into a larger facility, ensuring the new warehouse was ready to operate without delays.

Large commercial warehouse interior after flooring installation, showing a smooth, polished concrete floor with a clean reflective finish
General Contractor
Orlando, FL
Before & After

As part of a landlord refresh, Titan reground and polished a 4,000-square-foot paint booth area, restoring the floor to its original finish and helping prepare the space for re-lease.

Cold storage warehouse aisle with galvanized pallet racking and a clean concrete floor, ready for food distribution storage
Food Distributor
Sanford, FL

Titan collaborated with this client on the racking design, permitting, and phased installation for a 100,000+ square foot warehouse, delivering the project over eight months as construction progressed.

Finished grocery store sales floor with polished concrete, fully stocked aisles, and endcap displays in a bright, open interior
National Grocery Chain
Melbourne, FL
Before & After

Titan provided concrete grinding and polishing services for a new grocery store location, delivering a durable, high-performance floor built to handle daily traffic and long-term use.

Related Services

Planning a warehouse buildout? Titan can handle design, coordination, and installation from start to finish.